Date at Location: 06-17-2018
Trail: 17E06
Type of Issue: Other
Full Description: The first stream crossing is very doable using the logs. Trail verified to second stream crossing where the "elevated log" bridge is needed to cross since the water is still deep. Otherwise trail is clear.
Photo: No photo uploaded.